Joints are normally filled before the paved surface receives its final pass of the plate vibrator and they are then topped up afterwards as this process ‘beds in’ the jointing sand and it will naturally settle down into the joint. It is also essential to check joints 4-6 weeks after completion of the paving installation and top up as required as some further initial settling may occur.